• Luanda · Angola
  • Fire detection & suppression

Fire protection, from design to maintenance.

We design, install, commission and maintain fire detection and suppression systems in Angola, onshore and offshore.

FM200 suppression cylinders installed by N'JEPELE
FM200 · HFC-227ea
Founded
2024 · Luanda
Commissioning
SAQCC certified
Design
To NFPA standards
Operations
Onshore and offshore

01How it works

How a protected room puts out a fire.

A gas suppression system, from the first detector to discharge. This is what we design, install and test.

  1. Stage 1 / 4

    Normal

    The system is armed. Detectors and VESDA aspiration sample the air continuously, and the control panel supervises every circuit, day and night.

    Panel · extinguishing control
    Panel · extinguishing control
    Detection
    Smoke, heat and aspiration
    Supervision
    24 hours
  2. Stage 2 / 4

    Detection

    A first detector goes into alarm. The panel goes into pre-alarm and warns the occupants. In a typical system, one detector alone does not release the gas.

    VESDA · aspirating detection
    VESDA · aspirating detection
    Pre-alarm
    Warning, no discharge
    Aspiration
    VESDA
  3. Stage 3 / 4

    Alarm and delay

    A second detector confirms the fire. Sounders and beacons call for evacuation and the pre-discharge delay begins, typically 30 seconds, so everyone can leave the room.

    Ziton ZP3 · extinguishing control unit
    Ziton ZP3 · extinguishing control unit
    Confirmation
    2 detectors
    Delay
    Typically 30 s
  4. Stage 4 / 4

    Discharge

    The cylinders release the agent through the nozzles. FM200 (HFC-227ea) discharges within 10 seconds and puts the fire out without water or damage to the equipment. Inert gas systems discharge in one to two minutes.

    FM200 · cylinder bank
    FM200 · cylinder bank
    FM200
    Within 10 s
    Inert gas
    60–120 s
    Water
    None

Need to protect a server or plant room?

Talk to us on WhatsApp

02Services

A complete fire protection service.

From the first survey to routine maintenance, we look after the whole system so it works on the day it is needed.

Detect and warn

Ziton ZP3 fire control panel
  1. 01

    Fire detection

    Alarm panels, smoke and heat detectors and aspirating detection (VESDA) that raise the alarm early, so action can be taken before a fire grows.

    VESDA · Ziton ZP3 · smoke / heat

  2. 02

    Voice evacuation

    Loudspeaker systems for emergency announcements by floor, group of floors, stairwell or car park.

    By floor · stairwells · car park

Suppress and contain

CO₂ release station for an engine room
  1. 03

    Gas suppression

    FM200 and inert gas systems for server rooms, communications rooms and electrical switchrooms. They put out fire without water and without damaging equipment.

    FM200 · inert gas · no water

  2. 04

    Sprinklers & hose reels

    Sprinkler networks, hose reels and hydrants, with pumps and pipework sized for each building.

    Networks · pumps · hydrants

  3. 05

    Fire extinguishers

    Supply, installation and maintenance of portable extinguishers matched to each type of risk.

    Supply · maintenance

  4. 06

    Passive firestopping

    Sealing openings and joints in fire-rated walls and floors to stop fire and smoke from spreading.

    Sealing · walls and floors

Maintain and deliver

N'JEPELE technician at work
  1. 07

    Maintenance & inspections

    Alarm testing, pressure checks, sprinkler head cleaning and panel checks on a six-monthly and annual plan.

    6-monthly · annual · weekly

  2. 08

    Complete projects

    Design, planning, procurement, installation, inspection, quality control and handover, in Angola and abroad.

    Design · supply · handover

  3. 09

    Training

    Hands-on training for system users and for fire brigades.

    Users · fire brigades

One project, five steps

  1. 01

    Design

    Site visit, risk assessment and system design.

  2. 02

    Planning

    Scheduling the work and choosing the equipment.

  3. 03

    Installation

    Supplying, fitting and connecting the whole system.

  4. 04

    Inspection

    Testing, commissioning and quality control.

  5. 05

    Maintenance

    Routine checks so the system stays ready.

Tell us the building and the system you need.

Request a quote

03Installations

Installation record.

Equipment installed and commissioned by our team.

  • Inert cylinder bank

  • FM200 two-cylinder system

  • Pumps fire pump room

  • Hose reel reel and extinguisher station

  • CO2 cylinder cabinet

  • Alarm extinguisher and alarm bell

04Maintenance

A system only protects you if it works.

Regular inspections keep sprinkler heads and escape routes clear and confirm the alarm panel has no faults. This is the usual plan:

Request a maintenance plan
Every 6 months
Fire alarms, smoke detectors and emergency lighting
Annual
Hoses, hydrants and fire extinguishers
As needed
Escape routes and emergency exits
Weekly, on request
Support with weekly alarm tests

Brands and suppliers we work with

Ziton ZP3Xtralis VESDAFM200Pinnsec · InergenTycoScott Safety (SCBA & EEBD)Ansul

05Engineering

Beyond fire.

The same team delivers civil works and building services, from foundations to finishes.

  1. Swimming pools
  2. Civil construction
  3. HVAC & ductwork
  4. Water networks
  • Pool · pool and jacuzzi

    Pool pool and jacuzzi

  • Water · electrofusion welding unit

    Water electrofusion welding unit

  • House · under construction

    House under construction

Planning a build, a pool or HVAC work?

Talk to us on WhatsApp

06About us

A new company with an experienced team.

N'JEPELE – Engenharia e Serviços, Lda was founded in 2024 in Luanda. The team brings nearly a decade of experience in the onshore and offshore industry.

Our director holds a degree in Mechatronic Engineering and is an SAQCC-certified commissioner for fire and gas systems.

Mission

To protect lives, property and the environment with efficient, safe and innovative fire prevention and firefighting solutions, delivered with technical rigour, regulatory compliance and a commitment to sustainability.

Founded
2024
Based
Luanda, Angola
Leadership
Mechatronic Engineering degree · SAQCC commissioner
Sectors
Industrial · Commercial · Residential
Operations
Onshore and offshore
Values
Reliable · Durable · Guaranteed
The N'JEPELE team on site
Team · on site

07Contact

Tell us what you need to protect.

Quotes, site visits or maintenance: reach us on whichever channel suits you.

Chat on WhatsApp
Phone · Angola
+244 934 908 934
Phone · South Africa
+27 72 173 6564
Email
emidio.njepele@gmail.com
Address
Urbanização Nova Vida, Rua 105, Edifício 147, Apt. 02
Luanda, Angola